Archive of 2019 August

IMG-20190523-WA0001

The stabilization works carried out on the structure of the former railway tunnel of the Ponferrada-Villablino line, at the reservoir of Bárcena (El Bierzo), have been finished. Extraco, company in charge of the works, has delivered them to the Miño Sil Hydrographic Confederation. The former tunnel was part of the ancient railway line that used [...]

read more...