Building of two unidirectional lanes which connect the Technological and Logistic Park with the Second Belt Road of Vigo towards Madrid. The work included the re-establishment and installation of all type of services and the execution of a 4-span viaduct, with a total length of 148 meters, making a statically over determinate truss with a curved ground plan of 90 m in radius.
Contracting Entity: Consorcio Zona Franca de Vigo [Free Trade Zone of Vigo Consortium].